Construction Page for www. bestbuymetalproducts.con
click for page 2 CALL
405-381-4373
|
|
|
|
2 1/4 galvanized metal tubing (some companies use |
Corner braces installed in each corner (standard only on True-bilt units) optional with other companies. |
|
|
|
| Open span allowing for taller vehicles to be parked (some companies use bracing across the center portions and side (legs) similar to corner braces pictured above right. |
close up of how the 2 trusses are tied together (pictures reflect 7 piece bow system) some companies use a 3 piece, where the top bend and trusses are 1 piece. |
|
|
|
| L trim is placed on the front, and optional j-trim on bottom for cleaner look and protection from raw metal edge. This is an option well worth the money if it is not standard. | 30 inch rebar stakes are placed through tubing into ground. In some areas, these are considered Temporary. We recommend adding a concrete pier system after unit is installed. Our sales staff can explain. |
|
|
|
|
The units set on base tubes with short studs welded to them. The legs fit over the studs and then are screwed to the base. These studs are what keep the legs in place. |
|